Area alone does not describe installation effort
Measure walls, floors, skirtings, niches, steps, trims, patterns and feature areas separately.
Connect floor and wall takeoffs, patterns, cuts, trims, waste, substrate preparation, interfaces, installation progress, variations and claims.

Tiling profitability depends on patterns, room geometry, cuts, trims, substrate preparation, access, wet-area interfaces and material selections. SubbieTRAC makes those assumptions visible and keeps changed conditions connected to cost and entitlement.
Measure walls, floors, skirtings, niches, steps, trims, patterns and feature areas separately.
Record tile dimensions, laying pattern, cuts, wastage and supplier constraints by finish.
Clarify preparation, falls, screeds, membranes, penetrations and responsibility boundaries.
Link revised layouts, tile substitutions and details to quantities, orders, labour and variations.
SubbieTRAC keeps the original estimate, project delivery record and commercial actions connected so your team can act before risk turns into unrecovered cost.
Take off floors, walls, skirtings, niches, stairs, trims, movement joints and preparation by area.
Build tile format, pattern, cuts, waste, adhesive, grout, trims, access and productivity into the estimate.
Carry selections, quantities, supplier quotes, lead times, batches and room release dates into the project.
Follow preparation, waterproofing interfaces, screeds, laying, grouting, sealing, inspection and completion.
Capture substrate issues, revised layouts, changed tiles, additional cuts, access changes and remedial work.
Compare measured progress, material use, labour, pending changes, claims and remaining cost.
The system follows the work instead of forcing your team to rebuild the same information in spreadsheets, folders and manual registers.

Bring tender allowances, project progress, variation exposure, claims and forecast margin into one conversation.
SubbieTRAC turns trade knowledge into repeatable checks, responsibilities and next actions across estimating, delivery and contract administration.
Give each role the information it needs while preserving one reliable commercial history from tender to final claim.
Instead of managing tender allowances, site records, correspondence, variations and claims in separate places, SubbieTRAC keeps them connected to the same project.
See how a connected tender-to-final-claim workflow can help your team reduce missed scope, control change and protect project margin.